If you can figure out something useful to do during a two minute window, I envy you.
I really struggle with task switching, and two minutes is the danger zone. Just enough time to get distracted, by something else; too little time to start meaningful work on anything else...
Hour long compiles are okay, I plan them, and have something else to do while they are building.
30 second compiles are annoying, but don't affect my productivity much (except when doing minor tweaks to UI or copywriting).
I really struggle with task switching, and two minutes is the danger zone. Just enough time to get distracted, by something else; too little time to start meaningful work on anything else...
Hour long compiles are okay, I plan them, and have something else to do while they are building.
30 second compiles are annoying, but don't affect my productivity much (except when doing minor tweaks to UI or copywriting).
2-10 minute compiles are the worst.