Oh, I am nowhere near expert with SolidWorks. What I end up with are fairly brittle constructs: I first build components (parameterized), then plug them into assemblies, then add key parameters to the assembly, and finally set up component parameters to track those of the assembly.
BTW, top-down building (e.g. starting from the assembly) has never worked for me. I always end up with an unmaintainable mess — but that could be my poor skills.
BTW, top-down building (e.g. starting from the assembly) has never worked for me. I always end up with an unmaintainable mess — but that could be my poor skills.