From the article, ITER is currently projected at $15B which is not that much for a construction project of this scale. The crossrail project in London is costing ~$25B. Heathrow terminal 5 cost ~$6.5B. Also, it's not unusual for the costs of a major infrastructure project to be double or triple the estimate. I think they are doing just fine.