Funny you should mention that, because we're actually changing from Scrum to Kanban so we do not have sprints in the same sense that we had them before.
I think this numbering was started because Brackets is "pre-1.0". We'll see how our version numbering changes after we release 1.0 :)
I think this numbering was started because Brackets is "pre-1.0". We'll see how our version numbering changes after we release 1.0 :)