Hacker News new | past | comments | ask | show | jobs | submit login

I've always worked in places that either didn't have an IC track, due to being too small, or where the top of the IC track reported directly to higher levels of management.

I assume the idea was that if you're a Principal Engineer reporting to the VP of Engineering, and the team X Engineering Manager also reports to the VP of Engineering, then the two of you are in balance.




Join us for AI Startup School this June 16-17 in San Francisco!

Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: