Reprocessing and vitrification are certainly not financed in the bill since these require separate infra and nuclear pp can operate without them. Usually the waste is going through several stages of cooling and stored underground 'till reprocessing is possible/economically profitable'
Once a panel or blade reaches the end of its life, it is no one's responsibility to have to recycle it. https://www.bloomberg.com/news/features/2020-02-05/wind-turb...
Nuclear power is the only source that solves all the "problems" on the bill.