Hacker News new | past | comments | ask | show | jobs | submit login

When the value is set almost entirely by speculation then the fact that there’s a “drain” in the form of energy maintenance is basically irrelevant. How can you measure or analyze a speculation system with a 1 percent drain versus a speculation system without a drain? It’s all speculation in the end



Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: