In addition to being a large project to set up geothermal, they don't generally produce a lot of power. The largest deployment in the world is in California (The Geysers) and spans ~20 separate units, and each unit on average produces around 100 MW. A gas plant produces around 500 MW, and a nuclear plant about 1 GW.