Depends where you are. The company that built pre-fab parts for the 10-day 1,000 bed hospital in China is building a Huoshenshan equivalent hospital in Korea too.
11% of global CO2 emissions are from construction. Using pre-fab steel modules are not only more recyclable but the building process emits about 50% less CO2 as well. Building in earthquake resistance is much easier than steel-reinforced concrete. So it's not just an optimization on on-site time.
Unfortunately no translated captions in https://www.bilibili.com/video/BV1mK411p7X4 but the wall-to-wall robot in the factory gives you an idea of what the future looks like.
11% of global CO2 emissions are from construction. Using pre-fab steel modules are not only more recyclable but the building process emits about 50% less CO2 as well. Building in earthquake resistance is much easier than steel-reinforced concrete. So it's not just an optimization on on-site time.
Unfortunately no translated captions in https://www.bilibili.com/video/BV1mK411p7X4 but the wall-to-wall robot in the factory gives you an idea of what the future looks like.