Reading heavily between the lines now but I would think that this person also had enough (though maybe not as direct) experience to know to stagger the deployment, no?
No. As a quality guy he probably has a lot of experience with the single units, but not the system as a whole. No line inspector would have a reason to test a full ship-set of units off aircraft, so I can't imagine a lab setup to do this test with the proper staging.