Hacker News new | past | comments | ask | show | jobs | submit login

Well, it is not like "earlier calculations" didn't take into account such safety factors, but the debate is not about existance of safety factors or their amplitude (1.3 to 1.5 has been used as far as I can remember in concrete constructions) but rather on redundancy.

To give a different example elevators/lift (those using rope cables) have usually cables that have a factor of safety 5, but they have nonetherless additionally at least one set of independent brakes.

Back to bridges and more generally reinforced/pre-stressed concrete structures, in my experience modern methods of calculation are more precise than old ones, and allow usually - given the same loads/hypothesis - to save (i.e. there is less rebar steel and cable steel) between 5% and 10% steel and/or concrete.

In practice with old methods of calculation there was a 1.05/1.10 "implied" and "hidden" additional safety factor.




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: