|
|
| | Coding, Fast and Slow: Developers and the Psychology of Overconfidence (2013) (hut8labs.com) | |
1 point by itsdrewmiller on Jan 2, 2022 | past
|
| | Speeding Up Your Engineering Org, Part I: Beyond the Cost Center Mentality (hut8labs.com) | |
1 point by sciurus on Nov 3, 2020 | past
|
| | Speeding Up Your Engineering Org: Beyond the Cost Center Mentality (hut8labs.com) | |
2 points by iskippedlegday0 on June 13, 2018 | past
|
| | Coding, Fast and Slow: Developers and the Psychology of Overconfidence (hut8labs.com) | |
3 points by antouank on March 8, 2018 | past
|
| | Why it's Impossible to Estimate Software Development Time (hut8labs.com) | |
5 points by jtr1 on Sept 4, 2015 | past | 3 comments
|
| | Coding, Fast and Slow: Developers and the Psychology of Overconfidence (hut8labs.com) | |
2 points by sunseb on June 8, 2015 | past
|
| | Coding, Fast and Slow: Developers and the Psychology of Overconfidence (2013) (hut8labs.com) | |
204 points by sidcool on Nov 4, 2014 | past | 64 comments
|
| | Speeding Up Your Engineering Org, Part I: Beyond the Cost Center Mentality (hut8labs.com) | |
63 points by ojrac on April 29, 2014 | past | 14 comments
|
| | No Deadlines For You: Software Dev Without Estimates, Specs or Other Lies (hut8labs.com) | |
19 points by joeyespo on Dec 17, 2013 | past
|
| | Software Dev Without Estimates, Specs or Other Lies (hut8labs.com) | |
9 points by ojrac on Sept 25, 2013 | past
|
| | Coding, Fast and Slow: Developers and the Psychology of Overconfidence (hut8labs.com) | |
246 points by durumcrustulum on April 23, 2013 | past | 72 comments
|
| | On AWS, Worry About Availability Zone Failure Before Instance Failure (hut8labs.com) | |
3 points by ojrac on April 10, 2013 | past
|
|
Consider applying for YC's W25 batch! Applications are open till Nov 12.
Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact
|